Education Projects

NUIG, Information Technology Building

NUIG, Information Technology Building

Information Technology Building, NUIG

Brief Description of Works:

Electrical Installation & Data Cabling

Project Details

Project Value: € 1.4m

Brief Description of Works: Electrical Installation & Data Cabling

Tim Kelly Group carried out the complete Electrical Installation to the IT Building located within the NUIG campus. Electrical Services Installation including:
  • Cable Containment including trunking & tray
  • Main LV distribution board
  • Sub- distribution board
  • Sub-main cabling
  • General services Installation
  • Structured cabling system including fibre optic installation
  • Fire alarm installation
  • Intruder alarm system
  • CCTV Installation
  • Door Access System
  • Lightning Protection System

Other Projects

Sancta Maria College, Louisburgh

Knocknacarra District Centre

Connacht GAA Centre of Excellence

Penn Engineering New Manufacturing Site

Castle Dargan Hotel, Sligo

Ballina Beverages

Commercial Projects

Tesco Ireland

Tesco Ireland

Tesco Ireland

Brief Project Description

Complete Mechanical & Electrical installation to various new Tesco Stores.

Project Details

Contract Value: €4.5m

Brief Description of Works: Complete Mechanical & Electrical installation to various new Tesco Stores.

Mechanical Services Installation including:

  • Installation of hot and cold water systems
  • Air conditioning systems
  • HVAC systems
  • Soils and waste
  • LPHW and chilled water systems
  • Firefighting systems

Electrical Services Installation including:

  • Installation of lighting
  • Emergency lighting
  • Dimming Systems
  • Fire Alarm
  • PA System
  • Intruder Alarm
  • CCTV & Door Access
  • General Service
  • MV Switch & MV Cabling
  • Transformer
  • Main & Sub-distribution Boards
  • Installation of site lighting
  • Supplies to illuminating signs & installation of Belisha Beacons

Other Projects

Celestica Galway and Leixlip

IDA Advance Office Building, Sligo

Beaumont Hospital

Tubbercurry Secondary School

Killanin Stand, Galway Racecourse

NUIG AHSSRB Library

NUI Galway’s mission is to create a campus that is sustainable and efficient. We were delighted to part of that mission with the NUIG Library Electrical Services Installation.
Education Projects

NUIG Business School

NUIG Business School

Business School NUIG

Brief Project Description

Electrical Installation/ Data Cabling
Electrical Services Installation:
  • MV Cabling link to Campus MV network
  • MV Transformer
  • Main LV Distribution Board
  • Sub Distribution Board
  • LV Sub- Mains Cabling
  • Cable Containment
  • General Services
  • Lighting & Emergency Lighting
  • Fire Alarm
  • Intruder Alarm
  • Door Access
  • Structured Cabling
  • Mechanical Wiring
  • External Site Lighting
  • Test & Commissioning

Project Details

Project Value: € 1.8m

Other Projects

IDA Galway

NUIG AHSSRB Library

NUI Galway’s mission is to create a campus that is sustainable and efficient. We were delighted to part of that mission with the NUIG Library Electrical Services Installation.

Roche Ireland

Castle Dargan Hotel, Sligo

Letterkenny Leisure Park

Knocknacarra District Centre

Pharmaceutical Projects

Baxter Healthcare Ireland

Baxter Healthcare Ireland

Baxter_Castlebar

Brief Project Description

Tim Kelly Group has a presence on-site providing scheduled maintenance, emergency maintenance, Capital Works and out of hours callouts.

Project Details

Project Value: €5m (Mechanical & Electrical Services)

Brief Description of Works: Mechanical & Electrical Refurbishments & Installations in a pharmaceutical facility.

Mechanical works including:

  • Installation of LPHW/ CHW Pipework to serve AHU
  • Installation of Cold Water Services to all sanitary areas
  • Above ground, drainage to include soils and waste services
  • Ventilation and Air Conditioning to New Cleanroom and Office areas
  • BMS Controls- Installation of Energy Monitoring Control Valves
  • Modifications to Sprinkler System
  • Regular Upgrade Works to Stainless Steal Process Pipeline
  • Close interaction with Client Engineers to offer Value Engineering advice prior to Installation

Electrical Works including:

  • Installation of New Sub Boards including Submains Cabling
  • New General & Emergency Lighting Installation both (internal and external)
  • New Fire & intruder alarm systems
  • Installation of small power & data
  • Upgrade of existing lighting throughout the plant
  • Door access
  • CCTV
  • Intruder Alarm

Client Testimonial

“We have always found the team to be extremely professional, and their work is of the highest quality. Projects have been consistently undertaken and completed in an efficient and professional manner”

Ciaran Geraghty

General Manager, Ireland Manufacturing at Baxter Healthcare

Other Projects

Letterkenny IT, Phase 2B Nursing Block

Chanelle Group

HSE Roscommon Hospital Endoscopy Unit

Fairgreen Revenue Offices Galway

Our Lady of Lourdes, Drogheda

Mayo General Hospital, Castlebar

Pharmaceutical Projects

Merit Medical Vision Building, Galway

Merit Medical Vision Building

Brief Project Description

Electrical Services installation to New Building

Project Details

Contract Value: €2m                                               

Brief Description of Works

Electrical Installation of the R&D labs building including:

  • Lighting
  • Power
  • Fire alarm
  • Lightning Protection
  • Switchgear
  • Intruder alarm
  • CCTV
  • Disabled Toilet Alarm
  • Data
  • Door Access
  • UPS System
  • Power Factor Correction
  • MV Transformer
  • BMS wiring & standby generator
  • As installed manuals & commissioning

Some of the above-mentioned works were carried out in cleanroom environments.

Client Testimonial

Kyne & Clyne Engineering Consultants Ltd. have worked with Tim Kelly Group (TKG) for many years, the most recent project being for Merit Medical Ireland, Galway: the new Merit Vision Building, completed in 2012.

We have always found TKG to be competent, co-operative and diligent in their work. They have always completed their work to a very high standard and in accordance with the specifications and programmes and within budget.

Based on their exemplary performance to date I would have no hesitation in recommending Tim Kelly Group for any future works.

Michael Kyne

Other Projects

NUIG- Sports & Leisure Centre

Tubbercurry Secondary School

Dunnes Stores Terryland

Castle Dargan Hotel, Sligo

IDA Galway

Knock Basilica

This project involved the full Electrical Service Installations for the refurbishment of this magnificent landmark.

Posts navigation