Commercial Projects

IDA Advance Office Building, Sligo

IDA Advance Office Building, Sligo

Brief Project Description

The IDA Advanced Building in Finisklin Sligo Consisted of 48,000 sq. ft. Shell & Core New Build of 3 Levels for a future category A Office Fit Out. Tim Kelly Group carried out the Full M&E Installation and used Key Co-Ordination tools such as BIM. The project was designed to achieve LEED CS accreditation.

Project Details

Project Value: €2.5m (Mechanical & Electrical Services)

Brief Description of Works

Mechanical Works Consisted of the following works:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Gas Pipework Installation.
  • Gas Boilers Including Flue System.
  • Solar Panel System For Chlorifier.
  • Domestic Water Services.
  • Soils & Wastes.
  • Supply & Installation Of Sanitaryware.
  • LPHW Pipework.
  • CHW Pipework.
  • Supply & Installation Of Fan Coil Units.
  • Supply & Installation Of LPHW Heat Pump & CHW Heat Pump.
  • Ventilation Services Including Ductwork, Grilles, VCD’s & FSD’s.
  • Supply & Installation Of 2 No. AHU’s Office Areas & 2 no. AHU’s Toilet Areas.
  • Supply & Installation Of Full BMS System.
  • Testing & Commissioning.

Electrical Installation Consisted of the following works:

  • Cable Containment LV Trunking, ELV Cable Tray, FA Cable Tray & LV Cable Tray.
  • Sub Mains Cabling.
  • Main Distribution Board & 8 No. Sub Distribution Boards.
  • Power Factor Correction Unit.
  • General Services & Power.
  • Lighting & Emergency Lighting.
  • DALI Lighting Control System.
  • Solar PV System.
  • Fire Alarm System.
  • Disabled Refuge System.
  • Mechanical Wiring.
  • Lighting Protection System.
  • External Lighting.
  • Intruder Alarm System.
  • Earthing & Bonding.
  • Testing & Commissioning.
Commercial Projects

Genesys Office Fitout, Bonham Quay, Galway

Genesys Office Fitout, Bonham Quay, Galway

Brief Project Description

The Genesys Office Fitout Consisted of Mechanical Fitout for Genesys new R&D Centre within the Bonham Quay Office Development in Galway. The Project consisted of 35,000 sq ft of Grade A Office over four floors of the Development.

Project Details

Project Value: €1.5 million

Brief Description of Works

Mechanical Works Consisted Of The Following:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Soils & Waste Installation.
  • Water Services Installation.
  • Supply & Installation Fan Coil Units.
  • Tie Ins Into Existing Shell & Core LPH, CHW, CWS, HWS System.
  • LPHW & CHW Pipework.
  • Supply & Extract Air Distribution Ductwork.
  • Supply & Install Roof Mounted AHU.
  • Supply & Install Grilles, VCD’S, FSD’s & Attenuators.
  • Supply & Install Insulation, Incl. Thermobreak Insulation In Exposed Ceilings.
  • Supply & Install BMS System Incl. Field Control Devices.
  • Protective Services.
  • Testing & Commissioning.
  • “As-builts”.
Healthcare Projects

Donegal Primary Care Centre, Donegal Town

Donegal Primary Care Centre, Donegal Town

Brief Project Description

This new build Primary Care Centre in Donegal Town consisting of a 4 storey 54,500 sq. ft. The state of the art facility will provide a range of primary care services. Tim Kelly Group carried out the Mechanical Installation.

Project Details

Project Value: €1,500,000

Brief Description of Works

The Mechanical Works Consisted Of The Following:

  • Below Ground LPG Gas Services
  • LPG Gas Fired Boilers
  • Supply & Install Air To Water Heat Pump
  • LPHW Pipework
  • Supply & Install Radiators
  • Hot & Cold Domestic Water Services
  • Supply & Install AHU System
  • Supply & Install Of HVAC Ductwork, Ductwork Insulation, Supply & Extract Grills/VCD’s.
  • Soils & Wastes
  • Final Connections & Installation Of Sanitaryware
  • BMS System
  • Testing & Commissioning
Pharmaceutical Projects

Medtronic Customer Innovation Centre

Medtronic Customer Innovation Centre

Medtronic_Customer_Innovation_Centre

Brief Project Description

This project involved the full Electrical Service Installations for the Medtronic Customer Innovation Centre.

Project Details

Project Value: €800k

Brief Description of Works: Electrical Services Installation

Electric works including:

  • Cable Containment
  • Tie ins into existing B2 Building
  • Main & Sub Distribution Boards
  • Sub Mains Cabling
  • Power Factor Correction
  • Internal Lighting & Controls
  • Emergency Lighting
  • External Lighting
  • General Services & Power
  • Underfloor Busbar System to Desk Modules
  • Fire Alarm Installation
  • Leak Detection System
  • Structured IT Cabling System
  • Access Control System
  • Intruder Alarm System
  • CCTV System
  • Disabled Alarm System & Disabled Refuge System
  • Mechanical Wiring
  • Lightning Protection
  • Rack Mounted UPS System
  • Earthing & Bonding
  • Testing & Commissioning

Other Projects

Abbott Ireland

Abbott Ireland

Sligo University Hospital

Beaumont Hospital

Mylan Teoranta Ltd, Galway

NUIG Business School

Celestica Galway and Leixlip

Projects Public

Murdach’s Cathedral

Murdach's_Cathedral

Brief Project Description

Electrical Refurbishment Services Installed within Saint Muredach’s Cathedral, Ballina Parish.

Project Details

Project Value: €400k

Brief Description of Works: Electrical Services Installation

Electrical works including:

  • General & Emergency Lighting
  • General Service’s outlets
  • Fire Alarm
  • Public Address System
  • Exterior Lighting
  • New Fibre Optic Communications Network
  • Cable Containment
  • CCTV
  • Intruder & Door Access  System
  • Testing & Commissioning

Other Projects

Dunnes Stores Terryland

Castle Dargan Hotel, Sligo

NUIG Business School

Galway Garda Regional and Divisional Headquarters

Aptar Distribution Upgrade Ballinasloe

Tubbercurry Secondary School