Commercial Projects

IDA Advance Office Building, Sligo

IDA Advance Office Building, Sligo

Mechanical and Electrical services

Brief Project Description

The IDA Advanced Building in Finisklin Sligo Consisted of 48,000 sq. ft. Shell & Core New Build of 3 Levels for a future category A Office Fit Out. Tim Kelly Group carried out the Full M&E Installation and used Key Co-Ordination tools such as BIM. The project was designed to achieve LEED CS accreditation.

Project Details

Project Value: €2.5m (Mechanical & Electrical Services)

Brief Description of Works

Mechanical Works Consisted of the following works:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Gas Pipework Installation.
  • Gas Boilers Including Flue System.
  • Solar Panel System For Chlorifier.
  • Domestic Water Services.
  • Soils & Wastes.
  • Supply & Installation Of Sanitaryware.
  • LPHW Pipework.
  • CHW Pipework.
  • Supply & Installation Of Fan Coil Units.
  • Supply & Installation Of LPHW Heat Pump & CHW Heat Pump.
  • Ventilation Services Including Ductwork, Grilles, VCD’s & FSD’s.
  • Supply & Installation Of 2 No. AHU’s Office Areas & 2 no. AHU’s Toilet Areas.
  • Supply & Installation Of Full BMS System.
  • Testing & Commissioning.

Electrical Installation Consisted of the following works:

  • Cable Containment LV Trunking, ELV Cable Tray, FA Cable Tray & LV Cable Tray.
  • Sub Mains Cabling.
  • Main Distribution Board & 8 No. Sub Distribution Boards.
  • Power Factor Correction Unit.
  • General Services & Power.
  • Lighting & Emergency Lighting.
  • DALI Lighting Control System.
  • Solar PV System.
  • Fire Alarm System.
  • Disabled Refuge System.
  • Mechanical Wiring.
  • Lighting Protection System.
  • External Lighting.
  • Intruder Alarm System.
  • Earthing & Bonding.
  • Testing & Commissioning.
Pharmaceutical Projects

Medtronic Customer Innovation Centre

Medtronic Customer Innovation Centre

Medtronic_Customer_Innovation_Centre

Brief Project Description

This project involved the full Electrical Service Installations for the Medtronic Customer Innovation Centre.

Project Details

Project Value: €800k

Brief Description of Works: Electrical Services Installation

Electric works including:

  • Cable Containment
  • Tie ins into existing B2 Building
  • Main & Sub Distribution Boards
  • Sub Mains Cabling
  • Power Factor Correction
  • Internal Lighting & Controls
  • Emergency Lighting
  • External Lighting
  • General Services & Power
  • Underfloor Busbar System to Desk Modules
  • Fire Alarm Installation
  • Leak Detection System
  • Structured IT Cabling System
  • Access Control System
  • Intruder Alarm System
  • CCTV System
  • Disabled Alarm System & Disabled Refuge System
  • Mechanical Wiring
  • Lightning Protection
  • Rack Mounted UPS System
  • Earthing & Bonding
  • Testing & Commissioning

Other Projects

Murdach’s Cathedral

IDA Galway

Letterkenny IT, Phase 2B Nursing Block

Connacht GAA Centre of Excellence

Radisson Blu Hotel Extension, Dublin

Projects Public

Murdach’s Cathedral

Murdach's_Cathedral

Brief Project Description

Electrical Refurbishment Services Installed within Saint Muredach’s Cathedral, Ballina Parish.

Project Details

Project Value: €400k

Brief Description of Works: Electrical Services Installation

Electrical works including:

  • General & Emergency Lighting
  • General Service’s outlets
  • Fire Alarm
  • Public Address System
  • Exterior Lighting
  • New Fibre Optic Communications Network
  • Cable Containment
  • CCTV
  • Intruder & Door Access  System
  • Testing & Commissioning

Other Projects

Letterkenny University Hospital Radiology

Celtic Anglia Chemical Dosing Pipework Install

Mayo General Hospital, Castlebar

Roscommon Decentralised Offices

ECC TEO

Projects Public

Kylemore Abbey

Kylemore Abbey

Kylemore_Abbey

Brief Project Description

This project involved the Mechanical service installation for refurbishment and extension works to a historic building. Phase 2 of the project included and additional floor to St Joseph’s building.

Project Details

Project Value: €927k

Brief Description of Works: Mechanical Services Installation

Mechanical Works including:

  • Domestic Water
  • LPHW Heating
  • Ventilation
  • Air Conditioning
  • Building Management System
  • Soils & Waste
  • Filteration System
  • Gas Services

Other Projects

Celestica Galway and Leixlip

Ballyshannon Community School

NUIG- Sports & Leisure Centre

Tipperary Town OPW Offices

Knocknacarra District Centre

McHale Engineering

Healthcare Projects

Merlin Park Podiatry

Merlin_Park_Podiatry

Brief Project Description

Mechanical & Electrical Services Installation.

Project Details

Project Value: €520k

Brief Description of Works: Electrical Services Installation

Mechanical Services including the installation of the following:

  • Soils & Waste
  • LPHW
  • Hot & Cold Water Services
  • Supply & AHU
  • Ventilation Ductwork
  • Medical Air Systems
  • Gas Pipework
  • BMS System
  • Testing & Commissioning

Other Projects

Thermo King, Galway

Ballynahinch Castle, Galway

Roscommon Decentralised Offices

Ashford Castle

NUIG AHSSRB Library

NUI Galway’s mission is to create a campus that is sustainable and efficient. We were delighted to part of that mission with the NUIG Library Electrical Services Installation.

Ballina Beverages

Merlin Park Podiatry