Baxter Healthcare Ireland

Baxter_Castlebar

Brief Project Description

Tim Kelly Group has a presence on-site providing scheduled maintenance, emergency maintenance, Capital Works and out of hours callouts.

Project Details

Project Value: €5m (Mechanical & Electrical Services)

Brief Description of Works: Mechanical & Electrical Refurbishments & Installations in a pharmaceutical facility.

Mechanical works including:

  • Installation of LPHW/ CHW Pipework to serve AHU
  • Installation of Cold Water Services to all sanitary areas
  • Above ground, drainage to include soils and waste services
  • Ventilation and Air Conditioning to New Cleanroom and Office areas
  • BMS Controls- Installation of Energy Monitoring Control Valves
  • Modifications to Sprinkler System
  • Regular Upgrade Works to Stainless Steal Process Pipeline
  • Close interaction with Client Engineers to offer Value Engineering advice prior to Installation

Electrical Works including:

  • Installation of New Sub Boards including Submains Cabling
  • New General & Emergency Lighting Installation both (internal and external)
  • New Fire & intruder alarm systems
  • Installation of small power & data
  • Upgrade of existing lighting throughout the plant
  • Door access
  • CCTV
  • Intruder Alarm

Client Testimonial

“We have always found the team to be extremely professional, and their work is of the highest quality. Projects have been consistently undertaken and completed in an efficient and professional manner”

Ciaran Geraghty

General Manager, Ireland Manufacturing at Baxter Healthcare

Other Projects

Connacht GAA Centre of Excellence

Merit Medical Vision Building, Galway

Fairgreen Revenue Offices Galway

Penn Engineering New Manufacturing Site

Knocknacarra District Centre

ECC TEO

Baxter Healthcare Ireland