IDA Advance Office Building, Sligo

Mechanical and Electrical services

Brief Project Description

The IDA Advanced Building in Finisklin Sligo Consisted of 48,000 sq. ft. Shell & Core New Build of 3 Levels for a future category A Office Fit Out. Tim Kelly Group carried out the Full M&E Installation and used Key Co-Ordination tools such as BIM. The project was designed to achieve LEED CS accreditation.

Project Details

Project Value: €2.5m (Mechanical & Electrical Services)

Brief Description of Works

Mechanical Works Consisted of the following works:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Gas Pipework Installation.
  • Gas Boilers Including Flue System.
  • Solar Panel System For Chlorifier.
  • Domestic Water Services.
  • Soils & Wastes.
  • Supply & Installation Of Sanitaryware.
  • LPHW Pipework.
  • CHW Pipework.
  • Supply & Installation Of Fan Coil Units.
  • Supply & Installation Of LPHW Heat Pump & CHW Heat Pump.
  • Ventilation Services Including Ductwork, Grilles, VCD’s & FSD’s.
  • Supply & Installation Of 2 No. AHU’s Office Areas & 2 no. AHU’s Toilet Areas.
  • Supply & Installation Of Full BMS System.
  • Testing & Commissioning.

Electrical Installation Consisted of the following works:

  • Cable Containment LV Trunking, ELV Cable Tray, FA Cable Tray & LV Cable Tray.
  • Sub Mains Cabling.
  • Main Distribution Board & 8 No. Sub Distribution Boards.
  • Power Factor Correction Unit.
  • General Services & Power.
  • Lighting & Emergency Lighting.
  • DALI Lighting Control System.
  • Solar PV System.
  • Fire Alarm System.
  • Disabled Refuge System.
  • Mechanical Wiring.
  • Lighting Protection System.
  • External Lighting.
  • Intruder Alarm System.
  • Earthing & Bonding.
  • Testing & Commissioning.

IDA Advance Office Building, Sligo