Commercial Projects

IDA Advance Office Building, Sligo

IDA Advance Office Building, Sligo

Mechanical and Electrical services

Brief Project Description

The IDA Advanced Building in Finisklin Sligo Consisted of 48,000 sq. ft. Shell & Core New Build of 3 Levels for a future category A Office Fit Out. Tim Kelly Group carried out the Full M&E Installation and used Key Co-Ordination tools such as BIM. The project was designed to achieve LEED CS accreditation.

Project Details

Project Value: €2.5m (Mechanical & Electrical Services)

Brief Description of Works

Mechanical Works Consisted of the following works:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Gas Pipework Installation.
  • Gas Boilers Including Flue System.
  • Solar Panel System For Chlorifier.
  • Domestic Water Services.
  • Soils & Wastes.
  • Supply & Installation Of Sanitaryware.
  • LPHW Pipework.
  • CHW Pipework.
  • Supply & Installation Of Fan Coil Units.
  • Supply & Installation Of LPHW Heat Pump & CHW Heat Pump.
  • Ventilation Services Including Ductwork, Grilles, VCD’s & FSD’s.
  • Supply & Installation Of 2 No. AHU’s Office Areas & 2 no. AHU’s Toilet Areas.
  • Supply & Installation Of Full BMS System.
  • Testing & Commissioning.

Electrical Installation Consisted of the following works:

  • Cable Containment LV Trunking, ELV Cable Tray, FA Cable Tray & LV Cable Tray.
  • Sub Mains Cabling.
  • Main Distribution Board & 8 No. Sub Distribution Boards.
  • Power Factor Correction Unit.
  • General Services & Power.
  • Lighting & Emergency Lighting.
  • DALI Lighting Control System.
  • Solar PV System.
  • Fire Alarm System.
  • Disabled Refuge System.
  • Mechanical Wiring.
  • Lighting Protection System.
  • External Lighting.
  • Intruder Alarm System.
  • Earthing & Bonding.
  • Testing & Commissioning.
Projects Public

Murdach’s Cathedral

Murdach's_Cathedral

Brief Project Description

Electrical Refurbishment Services Installed within Saint Muredach’s Cathedral, Ballina Parish.

Project Details

Project Value: €400k

Brief Description of Works: Electrical Services Installation

Electrical works including:

  • General & Emergency Lighting
  • General Service’s outlets
  • Fire Alarm
  • Public Address System
  • Exterior Lighting
  • New Fibre Optic Communications Network
  • Cable Containment
  • CCTV
  • Intruder & Door Access  System
  • Testing & Commissioning

Other Projects

Celtic Anglia Chemical Dosing Pipework Install

Our Lady of Lourdes, Drogheda

Radisson Blu Hotel Extension, Dublin

Knocknacarra District Centre

GSK, Sligo

Hollister ULC, Ballina, Co. Mayo

Commercial Projects

IDA Galway

IDA Advanced Technology Building Galway

IDA_Advanced_Technology_Building_Galway

Brief Project Description

This project involved Mechanical and Electrical Service Installations.

Project Details

Project Value: €1.5m

Brief Description of Works: Mechanical and Electrical Works

Mechanical Works including:

  • Water Services
  • LPHW
  • CHW
  • Ventilation
  • Fire fighting equipment
  • Fan Coil Units
  • HRU Ventialtion
  • AHU
  • Chiller
  • Gas Services
  • Testing and Commissioning

Electrical Works including:

  • Cable Containment
  • LV Switchgear
  • Sub-mains Cabling
  • Lighting and Emergency Lighting
  • General Services and Power
  • Fire Alarm
  • Mechanical Wiring
  • Site Lighting
  • Lightning Protection
  • Earthing and Bonding
  • Testing and Commissioning

Other Projects

ECC TEO

McHale Engineering

Galway Mayo Institute Of Technology (GMIT)

Killanin Stand, Galway Racecourse

Merit Medical Vision Building, Galway

Radisson Blu Hotel Extension, Dublin

Commercial Projects

ECC TEO

Ecc Teo

Brief Project Description

This project involved the Electrical Service Installations.

Project Details

Project Value: € 1.3m

Brief Description of Works: Electrical Services Installation

Electrical works including:

  • Transformer
  • RMU
  • Power Factor Correction
  • LV Board installed in the new Switch room at the Dry storage Building which includes a connection from LV Panel to 4 (No.) Kilns

Other Projects

Mayo General Hospital, Castlebar

Connacht GAA Centre of Excellence

Dunnes Stores Terryland

Letterkenny IT, Phase 2B Nursing Block

Castle Dargan Hotel, Sligo

Knocknacarra District Centre

Commercial Projects

Knocknacarra District Centre

Knocknacarra District Centre

Brief Project Description

This project involved the Mechanical & Electrical Services Installations

Project Details

Project Value: € 1.5m

Brief Description of Works: Mechanical & Electrical Services Installation

Mechanical Installation:

  • Water Services
  • Car Park Extract System
  • Ventilation
  • Fire Hydrant
  • Metering of CWS
  • BMS System
  • Gas Skid for future
  • Soils & Wastes
  • Rain Water
  • Gas Detection System

Electrical Installation:

  • Containment
  • Landlord Main Board & Sub-Boards
  • Sub-Mains Cabling to Tenant Retail Units
  • Full Car Park Lighting & Emergency Lighting
  • Site Lighting
  • Fire Alarm
  • Disable Refuge
  • Mechanical Wiring
  • Shell & Core Lighting, Emergency Lighting & Fire Alarm to Tenant Units.

Other Projects

Bon Secours Hospital Galway

Fairgreen Revenue Offices Galway

Beaumont Hospital

Our Lady of Lourdes, Drogheda

Penn Engineering New Manufacturing Site

GSK, Sligo

Posts navigation