Ballina Beverages

Ballina Beverages

Brief Project Description

Tim Kelly Group have a permanent presence on site providing scheduled maintenance, emergency maintenance, small day works and out of hours callouts.

Project Details

Project Value: €2.3m (Mechanical & Electrical Services)

Brief Description of Works

Mechanical Services Installation:

Tim Kelly Group provided the complete mechanical and plumbing works for the facility.

Laboratory Areas

  • Laboratories all air central AHU HVAC systems
  • Microbiology Suite central AHU HVAC systems
  • Fume hood exhaust ventilation systems
  • Specific extract systems
  • Bench Extract (Nederman) systems
  • Heat Recovery Water system
  • MTHW heating system including tie-ins to existing systems
  • Chilled water cooling systems including tie-ins to existing systems
  • BMS control system and instrumentation
  • Domestic water services including tie-ins to existing systems
  • Process treated water to all laboratories
  • Above ground drainage systems (soils/ waste and laboratory systems)
  • Compressed air system
  • Laboratory gases storage and distribution systems
  • Cold rooms and refrigeration system packages

Administration Office Building

  • Four pipe fan coil HVAC systems
  • Fresh air, AHU with heat recovery
  • Toilet, ventilation system
  • MTHW heating system
  • Chilled water cooling system
  • BMS control system and instrumentation
  • Water services system
  • Above ground drainage system

Locker Room Extension 

  • Tie into existing MTHW system and extend to AHUs
  • Locker room heat recovery AHU systems
  • Toilet heat recovery AHU systems
  • Tie into existing DWS system
  • Domestic water services systems
  • BMS control system and instrumentation

Electrical Services:

Laboratory Areas

  • Sub Main Distribution Lab Panel
  • USP Distribution Panel
  • 60 KVA UPS unit complete with battery rack
  • General service sockets
  • Usp socket outlets
  • 2no 42u Comms Rack & Patch Panels
  • Fibre Optics Backbone Links
  • Data Outlets
  • General Lighting and Controls
  • Emergency Lighting and Controls
  • BMS control cabling and instrumentation cabling
  • Testing and certifying of the above system

Administration Office Building

  • General Service sockets
  • Ups Socket Outlets
  • 2no 42u Comms Racks and Patch Panels
  • Fibre Optic Backbone Links
  • Data Outlets
  • General Lighting and Controls
  • Emergency Lighting and Controls
  • Emergency Lighting and Controls
  • BMS control cabling and instrumentation cabling

Locker Room Extension

  • General Service sockets
  • Ups Socket outlets
  • 2no 42u Comms Racks & Patch Panels
  • Fibre Optic Backbone Links
  • Data Outlets
  • General Lighting and Controls
  • Emergency Lighting and Controls
  • BMS control cabling and instrumentation cabling

General 

  • BIM Co-ordination
  • Testing & Commissioning
  • Management of subcontractors
  • System demonstration and client training
  • Handover documentation

Other Projects

Galway Garda Regional and Divisional Headquarters

Letterkenny Leisure Park

IDA Galway

Murdach’s Cathedral

St. Louis Community School, Kiltimagh

Thermo King, Galway

Ballina Beverages