Celtic Anglia Water

Celtic_Anglia_Chemical_Dosing_Pipework_Install

Brief Project Description

This project involved the installation of dual containment pipes.

Project Details

Contract Value: €1.7m

Brief Description of Works: Mechanical Services Installation

The installation of dual containment pipes from existing metal salts dosing kiosk to 2 no. metal salt tank locations on the main water treatment tanks as per the following schedule of works. In addition to, the following:

  • Installation of Cantilever Bracketing System on the Side of Main Water Tank
  • Installation of FRP Cable Ladder System on Brackets
  • Installation of Stainless Steel Clips on Bracketing System to Accept Client Supplied Dual Containment Hose
  • Install Bracketing System for 2 No. Catchpot and Mount Catch Pots Locations as per Drawings
  • Installation of Client Supplied Dual Containment Hose from Metal Salts Kiosk to Catchpot
  • Installation of Client Supplied Dual Containment Hose from 2 No. Catchpot Locations to Remote Salt Tanks and Fix Saddle Clips
  • Carry Out Final Connections for Dual Containment Hose to Metal Salt Kiosk Catchpots and Remote Metal Salt Tanks
  • Label All Pipework and Carry Out Leak Test

Other Projects

Baxter Healthcare Ireland

Radisson Blu Hotel Extension, Dublin

Mylan Teoranta Ltd, Galway

Sligo University Hospital

Aptar Distribution Upgrade Ballinasloe

Tubbercurry Secondary School

Celtic Anglia Chemical Dosing Pipework Install