Ballina Beverages
Brief Project Description
Tim Kelly Group have a permanent presence on site providing scheduled maintenance, emergency maintenance, small day works and out of hours callouts.Project Details
Project Value: €2.3m (Mechanical & Electrical Services)Brief Description of Works
Mechanical Services Installation:
Tim Kelly Group provided the complete mechanical and plumbing works for the facility.
Laboratory Areas
- Laboratories all air central AHU HVAC systems
- Microbiology Suite central AHU HVAC systems
- Fume hood exhaust ventilation systems
- Specific extract systems
- Bench Extract (Nederman) systems
- Heat Recovery Water system
- MTHW heating system including tie-ins to existing systems
- Chilled water cooling systems including tie-ins to existing systems
- BMS control system and instrumentation
- Domestic water services including tie-ins to existing systems
- Process treated water to all laboratories
- Above ground drainage systems (soils/ waste and laboratory systems)
- Compressed air system
- Laboratory gases storage and distribution systems
- Cold rooms and refrigeration system packages
Administration Office Building
- Four pipe fan coil HVAC systems
- Fresh air, AHU with heat recovery
- Toilet, ventilation system
- MTHW heating system
- Chilled water cooling system
- BMS control system and instrumentation
- Water services system
- Above ground drainage system
Locker Room Extension
- Tie into existing MTHW system and extend to AHUs
- Locker room heat recovery AHU systems
- Toilet heat recovery AHU systems
- Tie into existing DWS system
- Domestic water services systems
- BMS control system and instrumentation
Electrical Services:
Laboratory Areas
- Sub Main Distribution Lab Panel
- USP Distribution Panel
- 60 KVA UPS unit complete with battery rack
- General service sockets
- Usp socket outlets
- 2no 42u Comms Rack & Patch Panels
- Fibre Optics Backbone Links
- Data Outlets
- General Lighting and Controls
- Emergency Lighting and Controls
- BMS control cabling and instrumentation cabling
- Testing and certifying of the above system
Administration Office Building
- General Service sockets
- Ups Socket Outlets
- 2no 42u Comms Racks and Patch Panels
- Fibre Optic Backbone Links
- Data Outlets
- General Lighting and Controls
- Emergency Lighting and Controls
- Emergency Lighting and Controls
- BMS control cabling and instrumentation cabling
Locker Room Extension
- General Service sockets
- Ups Socket outlets
- 2no 42u Comms Racks & Patch Panels
- Fibre Optic Backbone Links
- Data Outlets
- General Lighting and Controls
- Emergency Lighting and Controls
- BMS control cabling and instrumentation cabling
General
- BIM Co-ordination
- Testing & Commissioning
- Management of subcontractors
- System demonstration and client training
- Handover documentation