Commercial Projects

IDA Advance Office Building, Sligo

IDA Advance Office Building, Sligo

Mechanical and Electrical services

Brief Project Description

The IDA Advanced Building in Finisklin Sligo Consisted of 48,000 sq. ft. Shell & Core New Build of 3 Levels for a future category A Office Fit Out. Tim Kelly Group carried out the Full M&E Installation and used Key Co-Ordination tools such as BIM. The project was designed to achieve LEED CS accreditation.

Project Details

Project Value: €2.5m (Mechanical & Electrical Services)

Brief Description of Works

Mechanical Works Consisted of the following works:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Gas Pipework Installation.
  • Gas Boilers Including Flue System.
  • Solar Panel System For Chlorifier.
  • Domestic Water Services.
  • Soils & Wastes.
  • Supply & Installation Of Sanitaryware.
  • LPHW Pipework.
  • CHW Pipework.
  • Supply & Installation Of Fan Coil Units.
  • Supply & Installation Of LPHW Heat Pump & CHW Heat Pump.
  • Ventilation Services Including Ductwork, Grilles, VCD’s & FSD’s.
  • Supply & Installation Of 2 No. AHU’s Office Areas & 2 no. AHU’s Toilet Areas.
  • Supply & Installation Of Full BMS System.
  • Testing & Commissioning.

Electrical Installation Consisted of the following works:

  • Cable Containment LV Trunking, ELV Cable Tray, FA Cable Tray & LV Cable Tray.
  • Sub Mains Cabling.
  • Main Distribution Board & 8 No. Sub Distribution Boards.
  • Power Factor Correction Unit.
  • General Services & Power.
  • Lighting & Emergency Lighting.
  • DALI Lighting Control System.
  • Solar PV System.
  • Fire Alarm System.
  • Disabled Refuge System.
  • Mechanical Wiring.
  • Lighting Protection System.
  • External Lighting.
  • Intruder Alarm System.
  • Earthing & Bonding.
  • Testing & Commissioning.
Commercial Projects

Genesys Office Fitout, Bonham Quay, Galway

Genesys Office Fitout, Bonham Quay, Galway

Brief Project Description

The Genesys Office Fitout Consisted of Mechanical Fitout for Genesys new R&D Centre within the Bonham Quay Office Development in Galway. The Project consisted of 35,000 sq ft of Grade A Office over four floors of the Development.

Project Details

Project Value: €1.5 million

Brief Description of Works

Mechanical Works Consisted Of The Following:

  • Lead Co-Ordinator Using 3D BIM Modelling.
  • Soils & Waste Installation.
  • Water Services Installation.
  • Supply & Installation Fan Coil Units.
  • Tie Ins Into Existing Shell & Core LPH, CHW, CWS, HWS System.
  • LPHW & CHW Pipework.
  • Supply & Extract Air Distribution Ductwork.
  • Supply & Install Roof Mounted AHU.
  • Supply & Install Grilles, VCD’S, FSD’s & Attenuators.
  • Supply & Install Insulation, Incl. Thermobreak Insulation In Exposed Ceilings.
  • Supply & Install BMS System Incl. Field Control Devices.
  • Protective Services.
  • Testing & Commissioning.
  • “As-builts”.
Healthcare Projects

Donegal Primary Care Centre, Donegal Town

Donegal Primary Care Centre, Donegal Town

Brief Project Description

This new build Primary Care Centre in Donegal Town consisting of a 4 storey 54,500 sq. ft. The state of the art facility will provide a range of primary care services. Tim Kelly Group carried out the Mechanical Installation.

Project Details

Project Value: €1,500,000

Brief Description of Works

The Mechanical Works Consisted Of The Following:

  • Below Ground LPG Gas Services
  • LPG Gas Fired Boilers
  • Supply & Install Air To Water Heat Pump
  • LPHW Pipework
  • Supply & Install Radiators
  • Hot & Cold Domestic Water Services
  • Supply & Install AHU System
  • Supply & Install Of HVAC Ductwork, Ductwork Insulation, Supply & Extract Grills/VCD’s.
  • Soils & Wastes
  • Final Connections & Installation Of Sanitaryware
  • BMS System
  • Testing & Commissioning
Pharmaceutical Projects

Medtronic Customer Innovation Centre

Medtronic Customer Innovation Centre

Medtronic_Customer_Innovation_Centre

Brief Project Description

This project involved the full Electrical Service Installations for the Medtronic Customer Innovation Centre.

Project Details

Project Value: €800k

Brief Description of Works: Electrical Services Installation

Electric works including:

  • Cable Containment
  • Tie ins into existing B2 Building
  • Main & Sub Distribution Boards
  • Sub Mains Cabling
  • Power Factor Correction
  • Internal Lighting & Controls
  • Emergency Lighting
  • External Lighting
  • General Services & Power
  • Underfloor Busbar System to Desk Modules
  • Fire Alarm Installation
  • Leak Detection System
  • Structured IT Cabling System
  • Access Control System
  • Intruder Alarm System
  • CCTV System
  • Disabled Alarm System & Disabled Refuge System
  • Mechanical Wiring
  • Lightning Protection
  • Rack Mounted UPS System
  • Earthing & Bonding
  • Testing & Commissioning

Other Projects

Letterkenny University Hospital Radiology

Beaumont Hospital

Ballyshannon Community School

Avery Dennison, Longford

Kylemore Abbey

Letterkenny General Hospital- Acute Mental Health Unit Extension

Projects Public

Murdach’s Cathedral

Murdach's_Cathedral

Brief Project Description

Electrical Refurbishment Services Installed within Saint Muredach’s Cathedral, Ballina Parish.

Project Details

Project Value: €400k

Brief Description of Works: Electrical Services Installation

Electrical works including:

  • General & Emergency Lighting
  • General Service’s outlets
  • Fire Alarm
  • Public Address System
  • Exterior Lighting
  • New Fibre Optic Communications Network
  • Cable Containment
  • CCTV
  • Intruder & Door Access  System
  • Testing & Commissioning

Other Projects

Connacht GAA Centre of Excellence

Fairgreen Revenue Offices Galway

NUIG- Sports & Leisure Centre

McHale Engineering

Hollister ULC, Ballina, Co. Mayo

Roche Ireland

Posts navigation